NOUS62 KCHS 071958 FTMCLX MESSAGE DATE: DEC 07 2023 19:57:00 AN OPTICAL DRIVE FAILED DURING THE INSTALLATION OF RPG BUILD 22. A NEW DRIVE HAS BEEN ORDERED AND IS SCHEDULED TO ARRIVE FRIDAY. THE KCLX RADAR WILL REMAIN OUT OF SERVICE UNTIL THE NEW PART CAN BE INSTALLED AND THE BUILD INSTALLATION FINALIZED.